What it is
A series of clean vertical holes over a utility line to verify depth, size, and alignment for design or construction.
When you need it
Survey and design work, bore path verification, as-built confirmation, PA One Call follow-up.
What we bring
Debris tank [X] yd • Onboard water [X] gal • Typical hole [X] in diameter to [X] ft depth • Backfill / restoration: [describe]
Typical turnaround
Typical turnaround: [X] business days • [X] holes per day average
Fully insured, OSHA-trained crew. Certificates on request.

